RESEARCH OBSERVATORY / Overview Sources captured 2026-10-22 v0.2.1
Open evidence atlas · v0.2

See what AI water headlines leave out.

Computers produce heat. Cooling and electricity production can consume water in different places. Manufacturing is another boundary. There is no universal water-per-prompt figure and no verified global AI water total in this release.

Explore company reporting, regional context and conditional choices. Company figures are self-reported; selected metrics have limited assurance. ThirstyAI has not independently remeasured them.

Spot the missing boundary

Compare the period, fleet and withdrawal/consumption definition in the company disclosures below. JavaScript enables the interactive claim challenge.

Company water disclosures

Different periods, units and fleets: compare reporting, not company performance. Null is not zero.

Company / metricValue / unitPeriod / geography / scopeBoundary / confidenceSource / locator / caveat
Google / withdrawal14689.0 million gallons (as reported)2025-01-01/2025-12-31 / Global / Global operationswithdrawal / not_applicable / extraction HighGoogle / GOOGLE26
PDF p.96 Water use by data centers and offices, 2025; water methodology pp.87–88 / Not AI-only. Reported water excludes seawater and brackish water. Consumption = withdrawal minus discharge; some values may be estimated. Years and fleets differ.
Google / consumption10869.0 million gallons (as reported)2025-01-01/2025-12-31 / Global / Global operationsconsumption / not_applicable / extraction HighGoogle / GOOGLE26
PDF p.96 Water use by data centers and offices, 2025; water methodology pp.87–88 / Not AI-only. Reported water excludes seawater and brackish water. Consumption = withdrawal minus discharge; some values may be estimated. Years and fleets differ.
Google / withdrawal13562.0 million gallons (as reported)2025-01-01/2025-12-31 / Global / Operational data centers: owned and fully leasedwithdrawal / not_applicable / extraction HighGoogle / GOOGLE26
PDF p.96 Water use by data centers and offices, 2025; water methodology pp.87–88 / Not AI-only. Reported water excludes seawater and brackish water. Consumption = withdrawal minus discharge; some values may be estimated. Years and fleets differ.
Google / consumption10523.0 million gallons (as reported)2025-01-01/2025-12-31 / Global / Operational data centers: owned and fully leasedconsumption / not_applicable / extraction HighGoogle / GOOGLE26
PDF p.96 Water use by data centers and offices, 2025; water methodology pp.87–88 / Not AI-only. Reported water excludes seawater and brackish water. Consumption = withdrawal minus discharge; some values may be estimated. Years and fleets differ.
Google / PUE1.09 facility kWh / IT kWh2025-01-01/2025-12-31 / Global / Data-center fleetnot_applicable / not_applicable / extraction HighGoogle / GOOGLE26
PDF p.15, fleet-wide average PUE / Not AI-only; reporting periods, fleets and water definitions differ.
Google / WUENot extracted not extracted2025-01-01/2025-12-31 / Global / Latest annual reportnot_applicable / not_applicable / extraction HighGoogle / GOOGLE26
Report searched for WUE; no compatible fleet value located / No numeric value extracted from this annual report. Do not substitute the older Gemini serving-study WUE.
Microsoft / withdrawal13266.0 MLFY2025 ended 2025-06-30 / Global / Enterprise offices, owned/leased datacenters and labswithdrawal / not_applicable / extraction HighMicrosoft / MS26DATA
PDF p.7, Table 8, FY25 / Not AI-only; reporting periods, fleets and water definitions differ.
Microsoft / consumption8170.0 MLFY2025 ended 2025-06-30 / Global / Enterprise offices, owned/leased datacenters and labsconsumption / not_applicable / extraction HighMicrosoft / MS26DATA
PDF p.7, Table 8, FY25 / Not AI-only; reporting periods, fleets and water definitions differ.
Microsoft / PUE1.17 facility kWh / IT kWhFY2025 ended 2025-06-30 / Global / Data-center global averagenot_applicable / not_applicable / extraction HighMicrosoft / MS26REPORT
PDF p.23, Datacenters energy / Not AI-only; reporting periods, fleets and water definitions differ.
Microsoft / WUE0.27 L/kWh (publisher definition)FY2025 ended 2025-06-30 / Global / Owned datacenterswater_use_unspecified / energy_use_unspecified / extraction HighMicrosoft / MS26REPORT
PDF p.24; definition endnote 12 p.64 / Inspected 2026 definition says cooling/humidification water use divided by energy, without explicitly resolving withdrawal vs consumption and IT denominator. Not accepted as consumptive WUE by the calculator.
Meta / withdrawal5637.0 ML2024-01-01/2024-12-31 / Global / Operations excluding separately disclosed constructionwithdrawal / not_applicable / extraction HighMeta / META25
PDF p.9, section 3.1, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta / consumption3123.0 ML2024-01-01/2024-12-31 / Global / Operationsconsumption / not_applicable / extraction HighMeta / META25
PDF p.11, section 3.2, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta / withdrawal4145.0 ML2024-01-01/2024-12-31 / Global / Data centerswithdrawal / not_applicable / extraction HighMeta / META25
PDF p.9, section 3.1, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta / consumption2974.0 ML2024-01-01/2024-12-31 / Global / Data centersconsumption / not_applicable / extraction HighMeta / META25
PDF p.11, section 3.2, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta / PUE1.08 facility kWh / IT kWh2024-01-01/2024-12-31 / Global / Data centersnot_applicable / not_applicable / extraction HighMeta / META25
PDF p.8, section 2.4, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta / WUENot extracted L / IT kWh2024-01-01/2024-12-31 / Global / Data centerswithdrawal / IT_kWh / extraction HighMeta / META25
PDF p.18, methodology PUE/WUE / Definition is withdrawal-based. No fleet numeric WUE located in inspected current report/index; preserve missing value.

Location context, not a hotspot ranking

7 curated published location records; 5 US state-context matches; 0 verified exact facility/basin stress joins. No coordinates or water-supply basins are guessed. WRI administrative scores use a 1979–2019 modeled baseline. Unknown is not low risk.

Published location / waterRegional contextSource trail
Google Henderson, Nevada / 239.4 million gallons (as reported) / consumption / 2025Nevada / High (40-80%) / score 3.569639288 dimensionless / 1979-2019 baseline; Aqueduct 4.0 release 2023 / geographic confidence MediumGoogle / GOOGLE26 PDF p.97 Water use by data center location, Henderson NV
World Resources Institute / WRIADMIN province_baseline row 6456; name_1=Nevada, indicator_name=bws, weight=Tot
Google Mesa, Arizona / 9.7 million gallons (as reported) / consumption / 2025Arizona / Extremely High (>80%) / score 4.392122413 dimensionless / 1979-2019 baseline; Aqueduct 4.0 release 2023 / geographic confidence MediumGoogle / GOOGLE26 PDF p.97 Water use by data center location, Mesa AZ
World Resources Institute / WRIADMIN province_baseline row 2284; name_1=Arizona, indicator_name=bws, weight=Tot
Microsoft Phoenix, Arizona / 981 ML / withdrawal / FY2025 ended 2025-06-30Arizona / Extremely High (>80%) / score 4.392122413 dimensionless / 1979-2019 baseline; Aqueduct 4.0 release 2023 / geographic confidence MediumMicrosoft / MS26DATA PDF p.25 Table 15 Phoenix AZ; exclusions p.26
World Resources Institute / WRIADMIN province_baseline row 2284; name_1=Arizona, indicator_name=bws, weight=Tot
Meta Los Lunas, New Mexico / 252 ML / withdrawal / 2024New Mexico / Extremely High (>80%) / score 4.324930145 dimensionless / 1979-2019 baseline; Aqueduct 4.0 release 2023 / geographic confidence MediumMeta / META25 PDF p.9 Water withdrawal by facility, Los Lunas NM
World Resources Institute / WRIADMIN province_baseline row 2437; name_1=New Mexico, indicator_name=bws, weight=Tot
Meta Mesa, Arizona / 57 ML / withdrawal / 2024Arizona / Extremely High (>80%) / score 4.392122413 dimensionless / 1979-2019 baseline; Aqueduct 4.0 release 2023 / geographic confidence MediumMeta / META25 PDF p.9 Water withdrawal by facility, Mesa AZ
World Resources Institute / WRIADMIN province_baseline row 2284; name_1=Arizona, indicator_name=bws, weight=Tot

WRI Aqueduct extract, CC BY 4.0. State proxy is not current facility stress or evidence of causal harm.

India groundwater: all users, not AI extraction

36 state/UT observations from the 2025 CGWB assessment. Stage of extraction is annual extraction / annual extractable groundwater, not stored groundwater depleted. Ministry of Jal Shakti / PIB / CGWB25. WRI India / WRIINDIA26 separately studies data-centre siting and stress; we do not recreate its commercial location inventory.

Download the attributed state table

Decision lab

ILLUSTRATIVE INPUTS - NOT MEASUREMENTS

Hold useful IT work constant and compare direct consumptive WUE, PUE and electricity-related consumption. Manufacturing and local scarcity impacts are excluded. JavaScript enables the controls; these are hypothetical inputs, not measured company defaults.

Conditional futures to 2035

ILLUSTRATIVE INPUTS - NOT MEASUREMENTS

Demand growth and efficiency rates are assumptions. This is not a forecast of global AI water, drought or achieved savings.

Numerical claim register

Claim / valuePeriod / geographyBoundary / type / confidenceSource / locator / caveat
Data-centre electricity demand, 2025 / 485 TWh/year2025 / GlobalAll data centres, not AI alone / not_applicable / IEA estimate / HighInternational Energy Agency / IEA26
Executive summary, updated demand outlook paragraph / Electricity, not water; report vintage 2026.
Data-centre electricity demand, 2030 / 950 TWh/year2030 / GlobalAll data centres, not AI alone / not_applicable / IEA projection / MediumInternational Energy Agency / IEA26
Executive summary, updated demand outlook paragraph / Conditional central projection; not a measured future outcome.
India groundwater stage of extraction / 60.63 %2025 / IndiaAnnual extraction divided by annual extractable groundwater; all uses / not_applicable / Government reported / HighMinistry of Jal Shakti / PIB / CGWB25
Main text and Annexure I, Grand Total / Not the percentage of stored groundwater depleted. Does not attribute extraction to AI.
Median Gemini Apps text-prompt serving energy / 0.24 Wh/promptMay 2025 / Google serving fleetCompany-authored serving methodology, including facility overhead / not_applicable / Production study / HighElsworth et al. / Google / GOOGLE25
Table 2, comprehensive approach / Not every prompt or model; do not apply PUE again to facility-energy metric.
Median Gemini Apps text-prompt cooling water / 0.26 mL/promptMay 2025 / Google serving fleetAllocated direct consumptive cooling water; previous-year WUE / consumption / Company-modeled allocation / MediumElsworth et al. / Google / GOOGLE25
Section 3.3 and Table 2 / Not electricity-related or full lifecycle water. Cannot be generalized to all AI tasks.
US data-centre electricity reference case / 649 TWh/year2030 / United StatesAll US data centres; 2025 Update published June 2026 / not_applicable / LBNL projection / MediumLawrence Berkeley National Laboratory / LBNL26
Official publication abstract, Reference Case / Different model from IEA; not a water total. Do not combine projections as observations.
Google withdrawal / 14689 million gallons (as reported)2025-01-01/2025-12-31 / GlobalGlobal operations / withdrawal / company_reported / HighGoogle / GOOGLE26
PDF p.96 Water use by data centers and offices, 2025; water methodology pp.87–88 / Not AI-only. Reported water excludes seawater and brackish water. Consumption = withdrawal minus discharge; some values may be estimated. Years and fleets differ.
Google consumption / 10869 million gallons (as reported)2025-01-01/2025-12-31 / GlobalGlobal operations / consumption / company_reported / HighGoogle / GOOGLE26
PDF p.96 Water use by data centers and offices, 2025; water methodology pp.87–88 / Not AI-only. Reported water excludes seawater and brackish water. Consumption = withdrawal minus discharge; some values may be estimated. Years and fleets differ.
Google withdrawal / 13562 million gallons (as reported)2025-01-01/2025-12-31 / GlobalOperational data centers: owned and fully leased / withdrawal / company_reported / HighGoogle / GOOGLE26
PDF p.96 Water use by data centers and offices, 2025; water methodology pp.87–88 / Not AI-only. Reported water excludes seawater and brackish water. Consumption = withdrawal minus discharge; some values may be estimated. Years and fleets differ.
Google consumption / 10523 million gallons (as reported)2025-01-01/2025-12-31 / GlobalOperational data centers: owned and fully leased / consumption / company_reported / HighGoogle / GOOGLE26
PDF p.96 Water use by data centers and offices, 2025; water methodology pp.87–88 / Not AI-only. Reported water excludes seawater and brackish water. Consumption = withdrawal minus discharge; some values may be estimated. Years and fleets differ.
Google PUE / 1.09 facility kWh / IT kWh2025-01-01/2025-12-31 / GlobalData-center fleet / not_applicable / company_reported / HighGoogle / GOOGLE26
PDF p.15, fleet-wide average PUE / Not AI-only; reporting periods, fleets and water definitions differ.
Microsoft withdrawal / 13266 MLFY2025 ended 2025-06-30 / GlobalEnterprise offices, owned/leased datacenters and labs / withdrawal / company_reported / HighMicrosoft / MS26DATA
PDF p.7, Table 8, FY25 / Not AI-only; reporting periods, fleets and water definitions differ.
Microsoft consumption / 8170 MLFY2025 ended 2025-06-30 / GlobalEnterprise offices, owned/leased datacenters and labs / consumption / company_reported / HighMicrosoft / MS26DATA
PDF p.7, Table 8, FY25 / Not AI-only; reporting periods, fleets and water definitions differ.
Microsoft PUE / 1.17 facility kWh / IT kWhFY2025 ended 2025-06-30 / GlobalData-center global average / not_applicable / company_reported / HighMicrosoft / MS26REPORT
PDF p.23, Datacenters energy / Not AI-only; reporting periods, fleets and water definitions differ.
Microsoft WUE / 0.27 L/kWh (publisher definition)FY2025 ended 2025-06-30 / GlobalOwned datacenters / water_use_unspecified / company_reported / HighMicrosoft / MS26REPORT
PDF p.24; definition endnote 12 p.64 / Inspected 2026 definition says cooling/humidification water use divided by energy, without explicitly resolving withdrawal vs consumption and IT denominator. Not accepted as consumptive WUE by the calculator.
Meta withdrawal / 5637 ML2024-01-01/2024-12-31 / GlobalOperations excluding separately disclosed construction / withdrawal / company_reported / HighMeta / META25
PDF p.9, section 3.1, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta consumption / 3123 ML2024-01-01/2024-12-31 / GlobalOperations / consumption / company_reported / HighMeta / META25
PDF p.11, section 3.2, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta withdrawal / 4145 ML2024-01-01/2024-12-31 / GlobalData centers / withdrawal / company_reported / HighMeta / META25
PDF p.9, section 3.1, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta consumption / 2974 ML2024-01-01/2024-12-31 / GlobalData centers / consumption / company_reported / HighMeta / META25
PDF p.11, section 3.2, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.
Meta PUE / 1.08 facility kWh / IT kWh2024-01-01/2024-12-31 / GlobalData centers / not_applicable / company_reported / HighMeta / META25
PDF p.8, section 2.4, 2024 column / Not AI-only; reporting periods, fleets and water definitions differ.

Sources

DocumentScope / exact locatorLicence
International Energy Agency / IEA26 Key Questions on Energy and AI (2026)All data centres; global electricity / Executive summary: updated data centre electricity demand outlookCC BY 4.0 stated by publisher
Ministry of Jal Shakti / PIB / CGWB25 Findings of Dynamic Groundwater Resources AssessmentIndia state/UT annual groundwater; all uses / Annexure I: State-wise ground water resources of India, 2025Source facts attributed; no blanket licence asserted; raw document excluded
Elsworth et al. / Google / GOOGLE25 Measuring the environmental impact of delivering AI at Google ScaleMedian Gemini Apps text prompt; direct consumptive cooling water / Section 3.3 and Table 2; May 2025CC BY 4.0 on article
World Resources Institute / WRI23 Aqueduct 4.0 technical noteModeled water context, not local facility impact / Technical note: screening limits and future periodsCreative Commons stated; dataset-specific terms need review before ingestion
Microsoft / MS24 Next-generation datacenters consume zero water for coolingCompany design disclosure; not fleet conversion evidence / Mitigating energy impacts; footnote FY2024 withdrawal WUEPublisher copyright; raw article excluded
Lawrence Berkeley National Laboratory / LBNL26 United States Data Center Energy Usage Report: 2025 UpdateAll US data centres; electricity scenarios / Publication abstract; June 2026; Reference CaseMetadata/facts attributed; full report terms need review
Google / GOOGLE26 Google 2026 Environmental ReportCompany-reported environmental disclosure; not AI-only / PDF pp.96–97; water methodology pp.87–88; PUE p.15Publisher copyright; attributed extracted facts only; raw document excluded
Microsoft / MS26DATA Microsoft 2026 Environmental Data Fact SheetCompany-reported environmental disclosure; not AI-only / Tables 8 and 15, PDF pp.7,25-26; inventory methods pp.18-19Publisher copyright; attributed extracted facts only; raw document excluded
Microsoft / MS26REPORT Microsoft 2026 Environmental Sustainability ReportCompany-reported environmental disclosure; not AI-only / PDF pp.23-24; WUE definition endnote 12 p.64Publisher copyright; attributed extracted facts only; raw document excluded
Meta / META25 Meta 2025 Environmental Data IndexCompany-reported environmental disclosure; not AI-only / FY2024; PDF pp.8-11,18; facility withdrawal p.9Publisher copyright; attributed extracted facts only; raw document excluded
Meta / META25REPORT Meta 2025 Sustainability ReportCompany-reported environmental disclosure; not AI-only / 2024 reporting; current publisher reporting pagePublisher copyright; attributed extracted facts only; raw document excluded
Meta / Ernst & Young / META25ASSURANCE Meta Independent Accountants Review linked from 2025 reportCompany-reported environmental disclosure; not AI-only / Selected metrics, water withdrawal and consumption; not a whole-report auditPublisher copyright; attributed extracted facts only; raw document excluded
World Resources Institute / WRIADMIN Aqueduct 4.0 administrative rankings workbookDemand-weighted state/province context, not facility measurement / province_baseline sheet; indicator bws; weight Tot; 1979-2019 baselineCC BY 4.0, confirmed in wri/Aqueduct40 README
World Resources Institute / WRILICENCE Aqueduct 4.0 public documentation and licenceDataset licence and documentation / README licence paragraphCC BY 4.0
WRI India / WRIINDIA26 More Than Half of India’s Data Centres Are in Water-Stressed RegionsPublished India data-centre distribution analysis; not independently recreated here / 18 May 2026, main text and linked infographic; underlying sources namedAttributed summary only; no third-party infographic copied
Macknick et al. / NREL / NREL12 Operational water consumption and withdrawal factors for electricity generating technologiesUS electricity technologies; literature synthesis, not a current global grid factor / Abstract; DOI 10.1088/1748-9326/7/4/045802; 2012Publisher copyright; links and attributed facts only; no raw document distributed
TSMC / TSMC26 TSMC 2025 Sustainability Report now availableSemiconductor manufacturing company disclosure, not AI-only allocation / 20 August 2026; Water Positive commitment sectionPublisher copyright; links and attributed facts only; no raw document distributed
TSMC / TSMCWATER26 Supplier wastewater governanceSemiconductor supply-chain wastewater management; self-reported programme / 7 July 2026; Identifying Risks via Three Key IndicatorsPublisher copyright; links and attributed facts only; no raw document distributed
Meta / LimnoTech / METAVWB24 2024 Volumetric Water BenefitsCompany-commissioned restoration and basin context, not a causal harm study / August 2025; PDF pp.5,9,17,25; risk method, Prineville, Los Lunas, MesaPublisher copyright; links and attributed facts only; no raw document distributed

Download evidence and hashed provenance JSON

What can be done

Companies: disclose comparable boundaries, test whole-system cooling choices, reduce energy per useful result, monitor seasonality and keep replenishment separate. Governments: request supply and drought plans and monitor discharge. Communities: ask for local supply and competing-use evidence. Individuals: choose adequate tools and share sourced claims with caveats; quantified personal water savings remain a gap.

Limits

No global AI water estimate, precise facility/basin overlay, independent community causal study, chip-water allocation, validated PBIX. The supplied Excel Desktop run passed nine cases and save/reopen on 22 October 2026; see the repository current validation record for the tested workbook hash. PostgreSQL execution status is recorded separately. Regional and company evidence do not establish local damage. The historical limitations file is not silently upgraded before author confirmation.